1

I ran my PTV Vissim simulation a few times to see if it works. I noticed that the Data Collection Results tab collected all the data from these runs. How can I delete these previous data?

Edit: I think I was able to figure it out: 1) you have to delete/move the files from the "results" folder in the same directory, 2) close out the simulation, 3) then open the simulation again...

Ken White
  • 123,280
  • 14
  • 225
  • 444

1 Answers1

0

Yes, one way is to simply delete the results folder and re-open the network.

However, from within Vissim you can go to the menu Evaluation → Result lists → Simulation runs and in the opening list delete the obsolete (or all) simulation runs (this will also remove the corresponding evaluation results).

There is also the option in Evaluation → Configuration, Tab Result management, to keep the result of the "current (multi-)run only". Selecting this will automatically throw away existing results every time you start a new simulation.

Sedenion
  • 5,421
  • 2
  • 14
  • 42